A robot booth that is visible at night and keeps the rain out
Frame of 20 mm aluminium profile, composite cladding, finished with ready-made aluminium stock: tubes, angles and flat bar, no bending. The side lid is lifted by hand and lies on the roof, the end roller shutter lets the robot out, red-blue LED lines and beacons are visible from every side, and the sloped roof carries water into a gutter. The service bay holds a distribution board with controller, a router and a UPS; the robot charges on a wireless pad.
Narrated film, 1 min 50 s
How the booth works: water runs from the roof into the gutter, lines and beacons switch on at night, the robot leaves on patrol, a technician opens the lid and services the bay. Sound is in the player.
A model where everything works
A mesh from the same Fusion model. Drops run back down the roof, fall into the gutter and leave through the pipes; at night the red-blue lines and beacons tint the puddles. The roller shutter winds onto its shaft. “▶ Film” plays the same scenario in this scene; “Bay labels” shows the electrics.
Controls
Opens by hand and lies on the roof
The lid (~24 kg) is lifted by two handles and turned through 270°: it lies on top, overhanging the POLISIA side, and rests on two rubber-faced supports. The piano-hinge axis is raised onto the blue hinge beam (1345 mm), above the roof edge and beacons, so the lid clears the roof and touches nothing (checked in Fusion at every 30–45° over the whole booth).
- Release 4 toggle latchesTwo at the bottom of the lid hook the sill lip, two on the end posts engage catches on the lid. The lower one at the blind end has an eyelet for a padlock.
- Lift by the two handlesOne person raises the lid to vertical (~12 kgf at the edge); after that it swings over the axis by itself.
- Lower onto the supportsThe lid rests with its panel frame on 2 rubber pads on the right roof edge; the fold-down hooks of the supports are engaged behind the lid ends, so wind cannot lift it.
- CloseFold back the hooks, swing the lid back, lower it onto the EPDM seal and tighten the 4 latches.

On a 200×50 tube
The tube stands on the ceiling, with 50×8 flat bar and a 1860 mm piano hinge on top.
2 posts with hook
40×40 tube, rubber pad, fold-down hook.
Water runs backwards, not onto the door
The roof deck slopes at 2.7° from the door end to the blind end: the highest edge is above the roller shutter, so water never flows onto the entrance. At the rear the water leaves through a gap under the edge angle, runs off the deck edge into the gutter and flows away from the wall through two Ø50 pipes.
ACP 4 mm on 4 battens 2020
The battens sit on printed wedges above the frame cross-members; at the blind end the deck rests on rubber pads. The sheet is flat, and the gaps at the edges are closed with strips cut from its offcuts.
20 mm gap mm under the rear edge
The edge angle above the blind end is raised 20 mm across the full width; the side edges guide water to it, joints are sealed.
PVC channel 60×40 and 2 Ø50 pipes
Open cable trunking on 3 printed brackets on the top rail; PVC pipes on clamps to the end panel, with a 70 mm offset away from the wall at the bottom.
Visible from every side at night
Red-blue LED strips along the top rails of all four sides (on the lid, along its rail) and four flashing beacons on the caps. The roof above the door is kept clear: the IP camera is mounted there. Inside: two white strips of 1.43 m each and a presence sensor.
Red and blue IP67 strip
Segments of ~300 mm alternate, strip in a silicone tube on clips; the ESP32 flashes them in a double-flash pattern.
4 strobes on the caps
Ø64 base on 3 screws, Ø52 lens; two red at the door, two blue at the blind end.
ESP32 + 4 MOSFET channels
Red, blue + beacons, interior light, fan; modes “standby”, “alarm”, “robot inside”.
How the station is powered and controlled
Everything sits in the service bay behind the partition (Y 670–1150) on a galvanised mounting panel: IP65 board, UPS and router. The 220 V mains enter through an IP67 inlet on the blind end. The robot wireless charger and the heater run directly from the mains, while the link, camera and ESP32 run through the UPS, so the station stays online during a power cut.
Wireless pad
The robot backs onto the pad by itself and charges without connectors. The pad is powered from the mains through its own breaker QF2.
Up to ~0.6 kW
Robot charging (~300 W, confirm from datasheet), 150 W heating, 12 V ~100 W at peak, router, UPS recharge. Inlet cable 3×1.5 mm².
Corrugated conduit Ø20 and Ø16
From the board through 5 glands: to the UPS, through the partition to the robot charger, to the inlet on the end, and up to the LEDs and beacons.
| Unit in the model | What it is | Where it sits |
|---|---|---|
| IP65 board 400×300×150 | RCD, 3 breakers, 12 V PSU, ESP32 + MOSFET board, W1209 thermostat | on the mounting panel, top left |
| UPS SVC 1000 VA | powers the router and the 12 V PSU (camera, ESP32, LEDs) | on the floor on rubber feet |
| Router TP-Link Archer AX23 | Wi-Fi for the robot and ESP32, LAN for the camera | on the panel, top right, 4 antennas up |
| PTC heater 220 V 150 W | keeps +5…+10 °C around the robot in winter, blows through a grille | low on the partition |
| Fan 120 mm | air exchange between the bays in summer | high on the partition |
| IP camera 4 MP | watches the robot exit | on the roof above the door |
What each part is made of
In the model the parts are solid for appearance; in reality they are ready-made aluminium stock (tubes, angles, flat bar), composite and printed ASA. Everything is fixed with M6 bolts and rivet nuts to the profile, no welding (except stops).




| Element | Material | How it is made | Colour |
|---|---|---|---|
| Frame | Profile 20×20 and 20×40, slot 6 | Cut to size, assembled with M5 angle brackets and slot nuts | silver |
| Walls, ceiling, lid | ACP 3 mm | Rivets to the profile through VHB tape; diagonal braces stiffen the lid | silver |
| Roof deck | ACP 4 mm | Flat sheet on 2020 battens, edge shields from offcuts | silver |
| Floor | AMg2 chequer plate 2 mm | Cut 900×1960, screws into the bottom rail | silver |
| Corner, rails, edge, sill | Aluminium: angles 50×50, 60×40, 50×25; tubes 60×30, 60×20, 100×60 | Cut to size by the supplier, no bending | blue RAL 5002 |
| Braces, frames, battens, gutter | Flat bar 50×4; profile 2020; PVC trunking 60×40 | Cut to size; battens on printed wedges | blue / silver |
| Joints, plates, eyelets | Steel 3 mm | Laser-cut, two layers bolted | black RAL 9005 |
| Lid supports, hinge beam | Tube 40×40×2; tube 200×50×2 + flat bar 50×8 | Supports with rubber and fold-down hook; the beam stands on the ceiling | blue |
| Bumpers, caps, clips | ASA plastic | 3D-printed, 3 walls, 25% infill | black / blue |
| Downpipes | PVC Ø50 + bends | Clamps to the end panel | blue |
Assembly: watch and build
First the video: the whole booth step by step. Then what replaces what: everything arrives already cut to size, nothing needs bending. Detailed tables are below, in the expandable block.
- Bottom frameProfile 20×20 on angle brackets, diagonals ±2 mm
- 20×40 posts9 posts on angle brackets to the bottom frame
- Top frame20×20 on top, T- and L-plates at the corners
- Floor2 mm chequer plate on M5 screws
- Walls, ceiling, partitionACP 3 mm on VHB tape and rivets
- Roller shutterAlready made: box and guides on the end
- Service bayPanel, board, UPS and router, while the side is open
- Lid on the tablePanel, frame, braces, joints, rail, extension
- Hinge beam and sill200×50 tube on the ceiling, flat bar for the hinge, angle sill
- Hang the lidTwo people, insert the hinge axis
- CladdingCorner angle, rail tubes, brace flat bars, lettering
- RoofEdge of tube and angles, 2020 battens on wedges, deck
- DrainageGutter under the edge gap, two Ø50 pipes
- Bumpers and capsPrinted, at the very end
- LightingLED lines, beacons, interior light
- RobotSteps onto the wireless pad
Nothing is bent: what replaces what
Everything that used to be bent from galvanised sheet is now replaced by ready-made aluminium stock cut to size. The Fusion model and the 3D on this page already use these parts.
| Part | Was | Now | Cut, mm |
|---|---|---|---|
| Rails | bent galvanised 70×30 with chamfers | tube 60×30 at the top, 60×20 at the bottom and on the lid | 1960, 855 · 1880, 695, 1970 |
| Braces | hat profile 80×16 | flat bar 50×4 | 600 × 8, 620 × 8 |
| Panel frames | bent 50 mm frame | flat bar 50×4 | 1885, 1970, 755 × 2 · 810 × 6 |
| Blind-end corner | bent post 144×144 | angle 50×50×2 and flat bar 50×4 | 955 + 955 |
| Roof edge | bent box around the perimeter | tube 100×60 on the right, angle 60×40 on the ends | 2040 · 952, 882 |
| Hinge beam | bent box 40×150 | tube 200×50 + flat bar 50×8 | 1980 · 1860 |
| Sill | angle with lip | angle 50×25×3 | 2000 |
| Battens | wedge-shaped bent profile | 4 profiles 2020 on printed wedges | 1600 × 4 |
| Deck | ACP with V-groove folds | flat ACP 4 mm + shields from offcuts | 831 × 2135 |
| Gutter | bent 60×45 | PVC trunking 60×40 | 900 |
| Lid extension | bent U-profile | aluminium sheet 3 mm | 1860 × 233 |
Parts on the booth: where each one sits
Colour marks the part, pale shows the rest of the booth. These are the same parts as in the Fusion model.











How the sheets are held on the frame



- ACP sheet → frame: 19 mm VHB tape on the profile + 4.0 rivets along the posts and frames, pitch 150. Holes Ø4.1, no closer than 15 mm to the sheet edge.
- Cladding (rails, corner, edge, beam, sill) → frame: M5 screws with T-nut into slot 6, pitch 220–300. In the tube: Ø10 hole in the front wall for the wrench, Ø5.5 in the rear.
- Braces and frames (50×4 flat bar) → sheet: 4.0 rivets pitch 160, ends under the plates, over the posts an M5 screw into the slot.
- Deck → 2020 battens: 4.8 rivets with EPDM washer pitch 300, seams and heads sealed with MS polymer.
3D printing: what is printed



| Part | Qty | Size, mm | How to print | Plastic |
|---|---|---|---|---|
| Corner bumpers | 4 | 248 × 193 × 146 and smaller | 3 mm shell, open at the back, 4 walls | ~1.5 kg for all, 9–14 h each |
| Post caps | 4 | 152 × 152 × 45 | upside down, 4 walls, 25% | ~0.6 kg |
| Beacon bases | 4 | Ø64 × 18.5 | 4 walls, 40% | ~0.12 kg |
| Wedges under the deck battens | 16 | 20 × 40, height 7…80 | 5 walls, 50%; number and height on the side | ~0.4 kg |
| Gutter brackets | 3 | 73 × 24 × 49 | 5 walls, 50% | ~0.12 kg |
| Clamps for Ø50 downpipes | 4 | 80 × 60 × 20 | on its side, 4 walls, 40% | ~0.1 kg |
| Joint boss washers | 4 | Ø60 × 11 | face up, 4 walls, 30% | ~0.08 kg |
| LED strip clips | 34 | 20 × 14 × 8 | in a batch, 100% | ~0.07 kg |
ASA only (not PLA/PETG: they warp in the sun): 0.4 nozzle, 0.2 layer, 100 °C bed, enclosed printer. About 3 kg in total: 3–4 spools of 1 kg; in Fusion each part has its own body for STL export.
Lid locks and fixing



- Closed: 2 lower latches hook the sill edge, 2 side latches engage the catches on the posts; the padlock goes into the eyelet of the lower latch.
- Reed switch on the frame + magnet on the lid → ESP32: when the lid is opened a signal is sent and the interior light switches on.
- Open (270°): the lid lies on 2 rubber-faced supports, the fold-down hooks hold it against the wind.
All tables: cutting, laser, printing, materials, fasteners
Profile cutting
| Part No. | Part | Length, mm | Qty |
|---|---|---|---|
| 20×20SH | Longitudinals of bottom and top frame | 2000 | 4 |
| 20×20SH | Cross-members of bottom and top frame | 900 | 14 |
| 20×40SH | Frame posts | 1100 | 9 |
| 20×40SH | Roller-shutter frame posts | 900 | 2 |
Laser cutting, no bending
| Code | Part | Blank | Qty | Material |
|---|---|---|---|---|
| LC-01 | Corner brace plate 120×120 (stepped) | 120 × 120 + top layer 92 × 92 | 4 | Steel St3 hot-rolled 3 mm |
| LC-02 | Middle brace plate 170×100 | 170 × 100 + layer 142 × 72 | 2 | Steel St3 hot-rolled 3 mm |
| LC-03 | Brace joint: lower octagon 210 | 210 across flats | 2 | Steel St3 hot-rolled 3 mm |
| LC-04 | Brace joint: upper octagon 168 | 168 across flats | 2 | Steel St3 hot-rolled 3 mm |
| LC-05 | End frame gusset | legs 150 | 4 | Steel St3 hot-rolled 3 mm |
| LC-06 | End ventilation slot plate | 420 × 34, slot 380 × 10 | 1 | Steel St3 hot-rolled 3 mm |
| LC-07 | Service plate | 260 × 160 + layer 236 × 136 | 1 | Steel St3 hot-rolled 3 mm |
| LC-08 | Lid brace plates 120×120 / 170×100 | as LC-01 ×4, LC-02 ×2 | 6 | Steel St3 hot-rolled 3 mm |
| LC-09 | Lid brace joints (210 + 168) | as LC-03 ×2, LC-04 ×2 | 4 | Steel St3 hot-rolled 3 mm |
| LC-10 | Lid support flange | 100 × 80 | 2 | Steel St3 hot-rolled 3 mm |
| LC-11 | Support fold-down hook | 140 × 55 | 2 | Steel St3 hot-rolled 3 mm |
| LC-12 | Mounting panel | 1020 × 840 | 1 | Galvanised 2 mm |
3D printing (ASA)
| Code | Part | Qty | Size, mm | How to print |
|---|---|---|---|---|
| PR-01 | Joint boss washer (Ø60 + Ø36) | 2 | Ø60 × 11 | printed face up, 4 walls, 30% |
| PR-02 | Ø50 downpipe clamp | 4 | 80 × 60 × 20 | printed on its side, 4 walls, 40% |
| PR-03 | Gutter clamp bracket | 3 | 70 × 60 × 40 | printed, 5 walls, 50% |
| PR-04 | Lid joint boss washer | 2 | Ø60 × 11 | as PR-01 |
| PR-05 | Bumper, blind end, right | 1 | 248 × 193 × 146 | printed as a 3 mm shell (open at the back), 4 walls, 20% gyroid, brim, no external supports; 4 heat-set M6 nuts |
| PR-06 | Bumper, blind end, left | 1 | 193 × 185 × 76 | same |
| PR-07 | Post cap, right (for beacon) | 1 | 152 × 152 × 45 | printed upside down, 4 walls, 25%; Ø10 hole for the beacon wire |
| PR-08 | Post cap, left | 1 | 152 × 62 × 45 | same |
| PR-09 | Beacon adapter base | 2 | Ø64 × 18.5 | printed, 4 walls, 40% |
| PR-10 | LED strip clip | 34 | 20 × 14 × 8 | printed in a batch, 100% |
Materials
| Material | Grade, thickness | Where | Note |
|---|---|---|---|
| Profile | AD31 T1, 20×20 and 20×40 slot 6 | frame | slot 6 = M5 only |
| Aluminium stock | 6063 T5: tubes 60×30, 60×20, 100×60, 200×50; angles 50×50, 60×40, 50×25; flat bar 50×4, 50×8 | end corner, rails, edge, beam, braces, frames, sill | cut to size by the supplier, no bending |
| Steel | St3 hot-rolled 3 mm; tube 40×40×2 | joints, plates, eyelets; lid supports | deburr and prime edges after laser cutting |
| ACP | 3 mm (face 0.21) and 4 mm (0.3), PVDF coating | walls, ceiling, lid; roof deck | outdoors PVDF only, not PE paint |
| Floor | AMg2 chequer plate 2 mm | robot bay | — |
| Plastic | ASA | bumpers, caps, stands, clamps, clips | not PLA/PETG: they fade and warp |
| Seals | EPDM D-profile 9×8; VHB tape 4950 | lid; ACP to profile | apply VHB to a degreased surface at +10 °C or above |
| Sealant | MS polymer | roof seams, cable and camera passages, gutter | not silicone: it cannot be painted and peels off |
Fasteners
| Fasteners | Where | ~ pcs |
|---|---|---|
| DIN 912 M5×8 + M5 slot nut slot 6 | frame angles and plates | 210 |
| DIN 7380 M5×12 A2 + M5 slot nut slot 6 | stock to profile: corner, rails, edge, beam, sill, battens | 120 |
| Pop rivet 4.0×10 Al/St | ACP to profile, flanges, panel frames, hinge leaf | 400 |
| Rivet 4.8×12 + EPDM washer | roof deck to battens | 60 |
| Rivet nut M6 | removable parts: bumpers, caps, beacons, camera, supports | 40 |
| DIN 933 M6×20 A2 + EPDM washer | brace joints through ACP with a 2 mm plate inside | 16 |
| Bolt M8 + nylon-insert nut | support hook axes | 2 |
How the stock is fastened
| Part | What | To what | With |
|---|---|---|---|
| Blind-end corner | angle 50×50×2 on the right, flat bar 50×4 on the left | 20×40 frame posts through the ACP | M5 + slot nuts, pitch 220 |
| Rails | tube 60×30 at the top, 60×20 at the bottom and on the lid | top / bottom frame 20×20 | M5 + slot nuts pitch 300: Ø10 wrench hole in the front wall of the tube, Ø5.5 in the rear |
| Roof edge | tube 100×60 on the right, angle 60×40 on the ends | ceiling and top frame | M5 + slot nuts; the angle above the blind end is raised 20 mm: the drain gap is under it |
| Hinge beam | tube 200×50 + flat bar 50×8 | ceiling and top 20×20 of the lid side | M5 + slot nuts from inside, pitch 300; hinge: 4.8 rivets through the flat bar |
| Braces and panel frames | flat bar 50×4 | ACP and 20×40 posts | over posts M5 + slot nuts, elsewhere 4.0 rivets over VHB; brace ends under the plates |
| Deck battens | profile 2020 on printed wedges | top frame cross-members through the ceiling | M5 + slot nuts through the wedge; deck: 4.8 rivets with EPDM washer |
| Gutter | PVC trunking 60×40 without lid | top rail of the blind end | 3 printed brackets, ends capped with sealant |
| Sill | angle 50×25×3 | bottom frame 20×20 of the lid side | M5 + slot nuts, pitch 300 |
| Lid supports | tube 40×40×2 | right edge | flange on 4 M6 rivet nuts |
Painting the stock
- Tubes and angles can be ordered pre-coloured (powder coat or anodised): many suppliers offer it as a product variant.
- To paint them yourself: degrease, matt with an abrasive pad, 1 coat of aluminium primer, 2 coats of RAL 5002 / 9005 enamel 30 min apart.
- Cut ends and drilled spots: remove burrs and touch up with primer.