Student engineering projectA2 robot · wireless charging

A robot booth that is visible at night and keeps the rain out

Frame of 20 mm aluminium profile, composite cladding, finished with ready-made aluminium stock: tubes, angles and flat bar, no bending. The side lid is lifted by hand and lies on the roof, the end roller shutter lets the robot out, red-blue LED lines and beacons are visible from every side, and the sloped roof carries water into a gutter. The service bay holds a distribution board with controller, a router and a UPS; the robot charges on a wireless pad.

36 s · computer graphics from the 3D model, no neural networks
2,0 × 0,94 mfootprint, height 1.14 m, with roof 1.23 m
0–270°lid lifts by hand onto the roof
2,7°roof slopes back, gutter and 2 pipes
16 stepsassembly with bolts and rivets, no bending

Narrated film, 1 min 50 s

How the booth works: water runs from the roof into the gutter, lines and beacons switch on at night, the robot leaves on patrol, a technician opens the lid and services the bay. Sound is in the player.

02 · 3D model

A model where everything works

A mesh from the same Fusion model. Drops run back down the roof, fall into the gutter and leave through the pipes; at night the red-blue lines and beacons tint the puddles. The roller shutter winds onto its shaft. “▶ Film” plays the same scenario in this scene; “Bay labels” shows the electrics.

The 3D model loads when you scroll to it
Lid closed

Controls

0°
Mouse: rotate · wheel: zoom · right button: pan
03 · Lid

Opens by hand and lies on the roof

The lid (~24 kg) is lifted by two handles and turned through 270°: it lies on top, overhanging the POLISIA side, and rests on two rubber-faced supports. The piano-hinge axis is raised onto the blue hinge beam (1345 mm), above the roof edge and beacons, so the lid clears the roof and touches nothing (checked in Fusion at every 30–45° over the whole booth).

  1. Release 4 toggle latchesTwo at the bottom of the lid hook the sill lip, two on the end posts engage catches on the lid. The lower one at the blind end has an eyelet for a padlock.
  2. Lift by the two handlesOne person raises the lid to vertical (~12 kgf at the edge); after that it swings over the axis by itself.
  3. Lower onto the supportsThe lid rests with its panel frame on 2 rubber pads on the right roof edge; the fold-down hooks of the supports are engaged behind the lid ends, so wind cannot lift it.
  4. CloseFold back the hooks, swing the lid back, lower it onto the EPDM seal and tighten the 4 latches.
Lid open at 270° and lying on the booth roof, A2 robot on the pad inside
HINGE

On a 200×50 tube

The tube stands on the ceiling, with 50×8 flat bar and a 1860 mm piano hinge on top.

SUPPORTS

2 posts with hook

40×40 tube, rubber pad, fold-down hook.

04 · Roof

Water runs backwards, not onto the door

The roof deck slopes at 2.7° from the door end to the blind end: the highest edge is above the roller shutter, so water never flows onto the entrance. At the rear the water leaves through a gap under the edge angle, runs off the deck edge into the gutter and flows away from the wall through two Ø50 pipes.

DECK

ACP 4 mm on 4 battens 2020

The battens sit on printed wedges above the frame cross-members; at the blind end the deck rests on rubber pads. The sheet is flat, and the gaps at the edges are closed with strips cut from its offcuts.

DRAIN GAP

20 mm gap mm under the rear edge

The edge angle above the blind end is raised 20 mm across the full width; the side edges guide water to it, joints are sealed.

GUTTER

PVC channel 60×40 and 2 Ø50 pipes

Open cable trunking on 3 printed brackets on the top rail; PVC pipes on clamps to the end panel, with a 70 mm offset away from the wall at the bottom.

05 · Lighting

Visible from every side at night

Red-blue LED strips along the top rails of all four sides (on the lid, along its rail) and four flashing beacons on the caps. The roof above the door is kept clear: the IP camera is mounted there. Inside: two white strips of 1.43 m each and a presence sensor.

STRIPS

Red and blue IP67 strip

Segments of ~300 mm alternate, strip in a silicone tube on clips; the ESP32 flashes them in a double-flash pattern.

BEACONS

4 strobes on the caps

Ø64 base on 3 screws, Ø52 lens; two red at the door, two blue at the blind end.

CONTROL

ESP32 + 4 MOSFET channels

Red, blue + beacons, interior light, fan; modes “standby”, “alarm”, “robot inside”.

06 · Electrics

How the station is powered and controlled

Everything sits in the service bay behind the partition (Y 670–1150) on a galvanised mounting panel: IP65 board, UPS and router. The 220 V mains enter through an IP67 inlet on the blind end. The robot wireless charger and the heater run directly from the mains, while the link, camera and ESP32 run through the UPS, so the station stays online during a power cut.

220 V inletIP67 on the end RCD 25 A30 mA, IP65 board QF2 10 Awireless charging QF1 6 A → UPS SVC1000 VA, ~100 Wh QF3 10 APTC 150 W via W1209 Router Archer AX2312 V adapter, ≤12 W 12 V 200 W PSULRS-200-12, 16.6 A ESP32 + 4 MOSFET CH1 red LEDs · 24 WCH2 blue LEDs + beacons · 36 WCH3 interior light · 29 WCH4 120 mm fan · 2 W+ IP camera 12 V · 6 W Sensors → ESP32 presence → interior lightlid reed switch → alarm + TelegramW1209 thermostat → heater relay Wi-Fi
CHARGING

Wireless pad

The robot backs onto the pad by itself and charges without connectors. The pad is powered from the mains through its own breaker QF2.

FROM MAINS

Up to ~0.6 kW

Robot charging (~300 W, confirm from datasheet), 150 W heating, 12 V ~100 W at peak, router, UPS recharge. Inlet cable 3×1.5 mm².

CABLES

Corrugated conduit Ø20 and Ø16

From the board through 5 glands: to the UPS, through the partition to the robot charger, to the inlet on the end, and up to the LEDs and beacons.

Unit in the modelWhat it isWhere it sits
IP65 board 400×300×150RCD, 3 breakers, 12 V PSU, ESP32 + MOSFET board, W1209 thermostaton the mounting panel, top left
UPS SVC 1000 VApowers the router and the 12 V PSU (camera, ESP32, LEDs)on the floor on rubber feet
Router TP-Link Archer AX23Wi-Fi for the robot and ESP32, LAN for the cameraon the panel, top right, 4 antennas up
PTC heater 220 V 150 Wkeeps +5…+10 °C around the robot in winter, blows through a grillelow on the partition
Fan 120 mmair exchange between the bays in summerhigh on the partition
IP camera 4 MPwatches the robot exiton the roof above the door
07 · Structure

What each part is made of

In the model the parts are solid for appearance; in reality they are ready-made aluminium stock (tubes, angles, flat bar), composite and printed ASA. Everything is fixed with M6 bolts and rivet nuts to the profile, no welding (except stops).

POLISIA side: X-braces, lettering, bumpers
POLISIA side
Blind end with drainage
Blind end and drain
Lid side with latches
Lid side
End with the roller shutter raised, A2 robot on the pad
Roller-shutter end
ElementMaterialHow it is madeColour
FrameProfile 20×20 and 20×40, slot 6Cut to size, assembled with M5 angle brackets and slot nutssilver
Walls, ceiling, lidACP 3 mmRivets to the profile through VHB tape; diagonal braces stiffen the lidsilver
Roof deckACP 4 mmFlat sheet on 2020 battens, edge shields from offcutssilver
FloorAMg2 chequer plate 2 mmCut 900×1960, screws into the bottom railsilver
Corner, rails, edge, sillAluminium: angles 50×50, 60×40, 50×25; tubes 60×30, 60×20, 100×60Cut to size by the supplier, no bendingblue RAL 5002
Braces, frames, battens, gutterFlat bar 50×4; profile 2020; PVC trunking 60×40Cut to size; battens on printed wedgesblue / silver
Joints, plates, eyeletsSteel 3 mmLaser-cut, two layers boltedblack RAL 9005
Lid supports, hinge beamTube 40×40×2; tube 200×50×2 + flat bar 50×8Supports with rubber and fold-down hook; the beam stands on the ceilingblue
Bumpers, caps, clipsASA plastic3D-printed, 3 walls, 25% infillblack / blue
DownpipesPVC Ø50 + bendsClamps to the end panelblue
08 · Assembly

Assembly: watch and build

First the video: the whole booth step by step. Then what replaces what: everything arrives already cut to size, nothing needs bending. Detailed tables are below, in the expandable block.

Assembly animation, 1 min · same in the 3D model: the “▶ Step-by-step assembly” button
  1. Bottom frameProfile 20×20 on angle brackets, diagonals ±2 mm
  2. 20×40 posts9 posts on angle brackets to the bottom frame
  3. Top frame20×20 on top, T- and L-plates at the corners
  4. Floor2 mm chequer plate on M5 screws
  5. Walls, ceiling, partitionACP 3 mm on VHB tape and rivets
  6. Roller shutterAlready made: box and guides on the end
  7. Service bayPanel, board, UPS and router, while the side is open
  8. Lid on the tablePanel, frame, braces, joints, rail, extension
  9. Hinge beam and sill200×50 tube on the ceiling, flat bar for the hinge, angle sill
  10. Hang the lidTwo people, insert the hinge axis
  11. CladdingCorner angle, rail tubes, brace flat bars, lettering
  12. RoofEdge of tube and angles, 2020 battens on wedges, deck
  13. DrainageGutter under the edge gap, two Ø50 pipes
  14. Bumpers and capsPrinted, at the very end
  15. LightingLED lines, beacons, interior light
  16. RobotSteps onto the wireless pad

Nothing is bent: what replaces what

Everything that used to be bent from galvanised sheet is now replaced by ready-made aluminium stock cut to size. The Fusion model and the 3D on this page already use these parts.

PartWasNowCut, mm
Railsbent galvanised 70×30 with chamferstube 60×30 at the top, 60×20 at the bottom and on the lid1960, 855 · 1880, 695, 1970
Braceshat profile 80×16flat bar 50×4600 × 8, 620 × 8
Panel framesbent 50 mm frameflat bar 50×41885, 1970, 755 × 2 · 810 × 6
Blind-end cornerbent post 144×144angle 50×50×2 and flat bar 50×4955 + 955
Roof edgebent box around the perimetertube 100×60 on the right, angle 60×40 on the ends2040 · 952, 882
Hinge beambent box 40×150tube 200×50 + flat bar 50×81980 · 1860
Sillangle with lipangle 50×25×32000
Battenswedge-shaped bent profile4 profiles 2020 on printed wedges1600 × 4
DeckACP with V-groove foldsflat ACP 4 mm + shields from offcuts831 × 2135
Gutterbent 60×45PVC trunking 60×40900
Lid extensionbent U-profilealuminium sheet 3 mm1860 × 233

Parts on the booth: where each one sits

Colour marks the part, pale shows the rest of the booth. These are the same parts as in the Fusion model.

Blind-end corner
Blind-end cornerAngle 50×50×2 on the right, flat bar 50×4 on the left (at the lid) — 955 mm. M5 screws with slot nuts into the 20×40 posts through the sheet, pitch 220.
Top rails — 60×30 tube
Top rails — 60×30 tube1960 mm on the right, 855 mm on the end. LED line on the front face; M5 screws below the LED into the top frame, pitch 300.
Bottom rails and lid rail — 60×20 tube
Bottom rails and lid rail — 60×20 tube1880 and 695 mm at the bottom, 1970 mm on the lid. At the bottom: M5 screws into the bottom frame; on the lid: 4.0 rivets.
Braces and panel frames — 50×4 flat bar
Braces and panel frames — 50×4 flat barThe flat bar lies on the sheet and runs under the plates and joints: the plates clamp it with M6 bolts through the sheet. The frame is 4 pieces, with 4.0 rivets along it at 160 pitch.
Roof edge
Roof edgeTube 100×60 (2040 mm) on the right, angle 60×40×3 above the door and above the blind end. Above the blind end the angle is raised 20 mm: water runs out under it.
Hinge beam
Hinge beamA 200×50×2 tube stands on the ceiling above the lid side, with 50×8 flat bar (2 × 930 mm) and the piano hinge on top. M5 screws from inside into the top frame.
Sill — 50×25×3 angle
Sill — 50×25×3 angleAt the bottom of the lid side, 2000 mm. The lower lid latches hook over its edge. M5 screws into the bottom frame, pitch 300.
Deck battens and wedges
Deck battens and wedges4 profiles 2020 of 1600 mm each lie on 16 printed wedges above the frame cross-members, which gives the 2.7° slope. At the blind end the deck rests on rubber pads.
Roof deck
Roof deckFlat ACP sheet 4 mm, 831 × 2135, 4.8 rivets with EPDM washer into the battens, pitch 300. The gaps at the edges are closed with strips from an offcut of the same sheet.
Drainage
DrainageGutter — PVC trunking 60×40 without lid (900 mm), ends capped. 3 printed brackets on the top rail, 2 Ø50 pipes.
Lid extension
Lid extensionAluminium sheet 3 mm 1860 × 233, from the top of the lid to the hinge. Rivets to the lid and to the hinge leaf.

How the sheets are held on the frame

Brace joint
Braces under the jointThe 50×4 flat bar lies on the sheet and goes under the joint; the joint is raised 4 mm and clamped with 4 M6 bolts through the bar and sheet into a 2 mm plate on the inside. White dots are the 4.0 rivets of the sheet to the posts.
Corner of the end
Corner and railsThe corner angle and rail tubes are fixed with M5 screws and slot nuts straight into the frame profile slot. On the roof: 4.8 rivets with EPDM washer into the battens.
Rivets and screws
Rivets and screwsACP sheets: 4.0 rivets to the posts over VHB tape. Rails and corner: M5 screws with slot nut into the profile slot. Deck: 4.8 rivets with EPDM washer.

3D printing: what is printed

Bumpers — printed in ASA
Bumpers — printed in ASA4 pcs at the bottom corners: 248 × 193 × 146 and smaller. Printed as a 3 mm shell, open at the back, 4 × M6 into the post and rail. ~300–450 g, 9–14 h each.
Post caps and beacon bases — printed in ASA
Post caps and beacon bases — printed in ASA4 caps 152 × 152 × 45 and Ø64 beacon bases. Printed upside down, 4 walls, 25%. 2 × M5 into the post.
Wedges under the battens and gutter brackets — printed in ASA
Wedges under the battens and gutter brackets — printed in ASA16 wedges 7…80 mm high (each its own height, number on the side) and 3 gutter brackets. 5 walls, 50%, M5 screw right through.
PartQtySize, mmHow to printPlastic
Corner bumpers4248 × 193 × 146 and smaller3 mm shell, open at the back, 4 walls~1.5 kg for all, 9–14 h each
Post caps4152 × 152 × 45upside down, 4 walls, 25%~0.6 kg
Beacon bases4Ø64 × 18.54 walls, 40%~0.12 kg
Wedges under the deck battens1620 × 40, height 7…805 walls, 50%; number and height on the side~0.4 kg
Gutter brackets373 × 24 × 495 walls, 50%~0.12 kg
Clamps for Ø50 downpipes480 × 60 × 20on its side, 4 walls, 40%~0.1 kg
Joint boss washers4Ø60 × 11face up, 4 walls, 30%~0.08 kg
LED strip clips3420 × 14 × 8in a batch, 100%~0.07 kg

ASA only (not PLA/PETG: they warp in the sun): 0.4 nozzle, 0.2 layer, 100 °C bed, enclosed printer. About 3 kg in total: 3–4 spools of 1 kg; in Fusion each part has its own body for STL export.

Lid locks and fixing

Lid toggle latches
Lid toggle latches2 at the bottom of the lid hook the sill edge, 2 at the side on the posts, with catches on the lid. The lower ones have an eyelet for a padlock.
Closure sensor (reed switch)
Closure sensor (reed switch)Reed switch on the frame, magnet on the lid. The ESP32 sees whether the lid is closed and sends a signal if it is opened.
Lid handles and supports
Lid handles and supports2 handles at the bottom of the lid, lifted by two people. On the roof: 2 supports of 40×40 tube with rubber and a fold-down hook; the lid rests on them at 270°.
All tables: cutting, laser, printing, materials, fasteners

Profile cutting

Part No.PartLength, mmQty
20×20SHLongitudinals of bottom and top frame20004
20×20SHCross-members of bottom and top frame90014
20×40SHFrame posts11009
20×40SHRoller-shutter frame posts9002

Laser cutting, no bending

CodePartBlankQtyMaterial
LC-01Corner brace plate 120×120 (stepped)120 × 120 + top layer 92 × 924Steel St3 hot-rolled 3 mm
LC-02Middle brace plate 170×100170 × 100 + layer 142 × 722Steel St3 hot-rolled 3 mm
LC-03Brace joint: lower octagon 210210 across flats2Steel St3 hot-rolled 3 mm
LC-04Brace joint: upper octagon 168168 across flats2Steel St3 hot-rolled 3 mm
LC-05End frame gussetlegs 1504Steel St3 hot-rolled 3 mm
LC-06End ventilation slot plate420 × 34, slot 380 × 101Steel St3 hot-rolled 3 mm
LC-07Service plate260 × 160 + layer 236 × 1361Steel St3 hot-rolled 3 mm
LC-08Lid brace plates 120×120 / 170×100as LC-01 ×4, LC-02 ×26Steel St3 hot-rolled 3 mm
LC-09Lid brace joints (210 + 168)as LC-03 ×2, LC-04 ×24Steel St3 hot-rolled 3 mm
LC-10Lid support flange100 × 802Steel St3 hot-rolled 3 mm
LC-11Support fold-down hook140 × 552Steel St3 hot-rolled 3 mm
LC-12Mounting panel1020 × 8401Galvanised 2 mm

3D printing (ASA)

CodePartQtySize, mmHow to print
PR-01Joint boss washer (Ø60 + Ø36)2Ø60 × 11printed face up, 4 walls, 30%
PR-02Ø50 downpipe clamp480 × 60 × 20printed on its side, 4 walls, 40%
PR-03Gutter clamp bracket370 × 60 × 40printed, 5 walls, 50%
PR-04Lid joint boss washer2Ø60 × 11as PR-01
PR-05Bumper, blind end, right1248 × 193 × 146printed as a 3 mm shell (open at the back), 4 walls, 20% gyroid, brim, no external supports; 4 heat-set M6 nuts
PR-06Bumper, blind end, left1193 × 185 × 76same
PR-07Post cap, right (for beacon)1152 × 152 × 45printed upside down, 4 walls, 25%; Ø10 hole for the beacon wire
PR-08Post cap, left1152 × 62 × 45same
PR-09Beacon adapter base2Ø64 × 18.5printed, 4 walls, 40%
PR-10LED strip clip3420 × 14 × 8printed in a batch, 100%

Materials

MaterialGrade, thicknessWhereNote
ProfileAD31 T1, 20×20 and 20×40 slot 6frameslot 6 = M5 only
Aluminium stock6063 T5: tubes 60×30, 60×20, 100×60, 200×50; angles 50×50, 60×40, 50×25; flat bar 50×4, 50×8end corner, rails, edge, beam, braces, frames, sillcut to size by the supplier, no bending
SteelSt3 hot-rolled 3 mm; tube 40×40×2joints, plates, eyelets; lid supportsdeburr and prime edges after laser cutting
ACP3 mm (face 0.21) and 4 mm (0.3), PVDF coatingwalls, ceiling, lid; roof deckoutdoors PVDF only, not PE paint
FloorAMg2 chequer plate 2 mmrobot bay—
PlasticASAbumpers, caps, stands, clamps, clipsnot PLA/PETG: they fade and warp
SealsEPDM D-profile 9×8; VHB tape 4950lid; ACP to profileapply VHB to a degreased surface at +10 °C or above
SealantMS polymerroof seams, cable and camera passages, gutternot silicone: it cannot be painted and peels off

Fasteners

FastenersWhere~ pcs
DIN 912 M5×8 + M5 slot nut slot 6frame angles and plates210
DIN 7380 M5×12 A2 + M5 slot nut slot 6stock to profile: corner, rails, edge, beam, sill, battens120
Pop rivet 4.0×10 Al/StACP to profile, flanges, panel frames, hinge leaf400
Rivet 4.8×12 + EPDM washerroof deck to battens60
Rivet nut M6removable parts: bumpers, caps, beacons, camera, supports40
DIN 933 M6×20 A2 + EPDM washerbrace joints through ACP with a 2 mm plate inside16
Bolt M8 + nylon-insert nutsupport hook axes2

How the stock is fastened

PartWhatTo whatWith
Blind-end cornerangle 50×50×2 on the right, flat bar 50×4 on the left20×40 frame posts through the ACPM5 + slot nuts, pitch 220
Railstube 60×30 at the top, 60×20 at the bottom and on the lidtop / bottom frame 20×20M5 + slot nuts pitch 300: Ø10 wrench hole in the front wall of the tube, Ø5.5 in the rear
Roof edgetube 100×60 on the right, angle 60×40 on the endsceiling and top frameM5 + slot nuts; the angle above the blind end is raised 20 mm: the drain gap is under it
Hinge beamtube 200×50 + flat bar 50×8ceiling and top 20×20 of the lid sideM5 + slot nuts from inside, pitch 300; hinge: 4.8 rivets through the flat bar
Braces and panel framesflat bar 50×4ACP and 20×40 postsover posts M5 + slot nuts, elsewhere 4.0 rivets over VHB; brace ends under the plates
Deck battensprofile 2020 on printed wedgestop frame cross-members through the ceilingM5 + slot nuts through the wedge; deck: 4.8 rivets with EPDM washer
GutterPVC trunking 60×40 without lidtop rail of the blind end3 printed brackets, ends capped with sealant
Sillangle 50×25×3bottom frame 20×20 of the lid sideM5 + slot nuts, pitch 300
Lid supportstube 40×40×2right edgeflange on 4 M6 rivet nuts

Painting the stock

  • Tubes and angles can be ordered pre-coloured (powder coat or anodised): many suppliers offer it as a product variant.
  • To paint them yourself: degrease, matt with an abrasive pad, 1 coat of aluminium primer, 2 coats of RAL 5002 / 9005 enamel 30 min apart.
  • Cut ends and drilled spots: remove burrs and touch up with primer.